Training Analisis Network Planning Dengan Cpm (Critical Path Methode) dan Program Evaluation Review and Technique (PERT) Dalam Rangka Efisiensi Waktu Dan Biaya Proyek

Training Analisis Network Planning Dengan Cpm (Critical Path Methode) dan Program Evaluation Review and Technique (PERT) Dalam Rangka Efisiensi Waktu Dan Biaya Proyek

Training Analysis of Network Planning With Cpm (Critical Path Method) and Program Evaluation and Review Technique (PERT) in the Context of Time And Cost Efficiency Project

Analysis of Network Planning With Cpm

Description Training Analysis of Network Planning With Cpm

The impact of the financial crisis until today still strongly felt by the nation of Indonesia. Various increasingly complex problems on the economy in Indonesia is becoming increasingly unstable. It pushes each company to further increase the potential resources that are owned by the existing technology fitted, so that the company can survive in the competition, both regionally, nationally, and globally.

Companies that can not compete will defeat or decline, even many companies that exist in Indonesia have gone bankrupt. This is because these companies are not able to compete in a variety of ways, which include competing in time and production costs. In relation to the time and cost of production, the company must be efficient in the use of time in a project, it needed a project management.

To assist in planning the project completion can apply analytics Network. In addition, the Network with the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) can also be used as a surveillance tool which is good enough for the completion of the project.

CPM is oriented methods that lead to the determination of the time schedule and the estimated time is diterministik / Sure. While PERT is a method that is oriented in the time leading up to the determination of the schedule and the time is probabilistic / possibilities.

Aim

After this training, participants are expected to control the coordination of activities in a job so that the project can be completed within an appropriate period can also help companies to conduct planning and controlling projects with more time and cost efficient.

Training Content Analysis of Network Planning With Cpm

1. The scope of the Project

Project Management
Structure Work Solving
Project Scheduling
Setup Project
2. Project Management:

Planning
Scheduling
Control
Decision
3. Critical Path Method Critical-Path Method (CPM)
4. Cost and Time acceleration of project support
5. Analysis of direct and indirect costs
6. Program Evaluation and ReviewTechnique (PERT)

participant

Participants can be followed by all those interested in this field. It can also be followed by all who want to move on and learn more on this field.

instructor

Instructor in Training and Training will be hosted by an expert in this field.

Method

1. Presentation

2. Discussion among participants

3. Case studies

4. Simulation

5. Evaluation

6. Consultation with instructor

Jadwal Pelatihan Lokal Media Training 2024 :

Batch 1 : 03 – 04 Januari 2024 | 16 – 17 Januari 2024 || Batch 2 : 06 – 07 Februari 2024 | 20 – 21 Februari 2024

Batch 3 : 05 – 06 Maret 2024 | 19 – 20 Maret 2024 || Batch 4 : 03 – 04 April 2024 | 23 – 24 April 2024

Batch 5 : 07 – 08 Mei 2024 | 21 – 22 Mei 2024 || Batch 6 : 05 – 06 Juni 2024 | 25 – 26 Juni 2024

Batch 7 : 09 – 10 Juli 2024 | 23 – 24 Juli 2024 || Batch 8 : 06 – 07 Agustus 2024 | 20 – 21 Agustus 2024

Batch 9 : 04 – 05 September 2024 | 18 – 19 September 2024 || Batch 10 : 08 – 09 Oktober 2024 | 22 – 23 Oktober 2024

Batch 11 : 06 – 07 November 2024 | 26 – 27 November 2024 || Batch 12 : 04 – 05 Desember 2024 | 18 – 19 Desember 2024

Jadwal Pelatihan Lokal Media

TEMPAT PELAKSANAAN PELATIHAN

  • REGULER TRAINING
    • YOGYAKARTA
    • JAKARTA
    • BANDUNG
    • MALANG
    • SURABAYA
    • BALI
    • LOMBOK – NTB
  • IN HOUSE TRAINING
  • ONLINE TRAINING VIA ZOOM

Note :

Waktu dan tempat pelaksanaan pelatihan bisa kami sesuaikan dengan kebutuhan peserta.

Investasi Pelatihan Lokal Media Training:

  1. Investasipelatihan selama tiga hari tersebut menyesuaikan dengan jumlah peserta
  2. Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan.

Fasilitas Pelatihan di Lokal Media Training:

  1. Hotel
  2. Tempat Pelatihan
  3. Module / Handout
  4. FREE Flashdisk
  5. Sertifikat
  6. FREE Bag or bagpackers (Tas Training)
  7. Training Kit (Dokumentasi photo, Blocknote, ATK, etc)
  8. 2xCoffe Break & 1 Lunch, Dinner
  9. FREE Souvenir Exclusive
  10. Training room full AC and Multimedia